| Evolution of the Brunswick River crossing. |
|
Early works. |
|
Aerial view of Brunswick River Bridge. |
|
Triple Cell Pipe Culvert - Stockroute Road showing a 1500 diam. culvert for fauna. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| STP Access (columns to support abutment headstock). |
|
Pile reinforcement cages. |
|
Fixing stainless steel southside pier (Brunswick River Bridges) |
|
Completed southern blade pier to Brunswick River bridges service road. |
 |
 |
 |
 |
 |
|
 |
 |
 |
| Abutment A pilecap. Night pour, early a.m. (Brunswick River bridges). |
|
Abutment A pilecap. Night pour workers, 2 concrete boom pumps (Brunswick River bridges). |
|
Tower crane. |
|
Installing driver cab on tower crane 1. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Installing driver cab on tower crane 2. |
|
North Bank tower crane installation. |
|
Aerial of Marshalls Creek. December 2005 |
|
Aerial of southern approach Tweed St overpass, showing "travellers" ready for bridge assembly. December 2005 |
 |
 |
 |
 |
 |
 |
 |
|
 |
| Northern end of project, Yelgun. Aerial December 2005 |
|
Bypass duplication. Aerial December 2005 |
|
Monitoring noise for night pour Brunswick River bridges |
|
|
 |
| Week Ending 12-03-06 & 19-03-06 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Guard rail installation in Banana Road. |
|
Installation of 1350 dia stormwater pipe opposite Wilfred St, Billinudgel. |
|
Super Ts (bridge beams) transported to Marshalls Creek. |
|
Water Quality Basin. |
 |
| Week Ending 26-03-06 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Aerial photographs of southern side of Brunswick River site. |
|
Aerial photographs of southern side of Brunswick River site. |
|
Northern pierhead to service road bridge during concrete pour to webs and diaphragm. |
|
Northern abutment showing completed curtain walls. |
 |
 |
 |
 |
 |
|
 |
|
 |
| Looking north showing green fauna fencing on left. |
|
Blue noise wall, northwards from Rajah Road. |
|
|
|
|
 |
| Week Ending 2-04-06 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Preparing fauna crossing, showing refuge pole at entry. |
|
Completed fauna crossing with refuge pole. |
|
Extension of existing railway culvert. |
|
Extension of existing drainage & connection to existing railway culvert, Yelgun. |
 |
| Week Ending 30-04-06 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Banana Road nearing completion. |
|
South side Brunswick River after first segment pour. |
|
Installing travelling forms on southern pier of local road bridge, Brunswick River. |
|
Piers and abutments north side Brunswick River. |
 |
 |
 |
|
 |
|
 |
|
 |
| Yelgun Interchange taking shape, with piers for northbound flyover in centre left of image. |
|
|
|
|
|
|
 |
| Week Ending 21-05-06 & 28-05-06 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Form traveller linings for bridge segments being transported on barge across the Brunswick River. |
|
Excavator placing concrete panels for bridge abutment at Bonanza Drive. |
|
Brunswick River: May 17th, 2006 at 4:40pm. |
|
Trimming back piles at Brunswick Bypass duplication. |
 |
 |
 |
 |
 |
|
 |
|
 |
| Retaining walls for bridge abutment at Yelgun northbound offload ramp. |
|
Brunswick River 29th May, 2006. |
|
|
|
|
 |
| Week Ending 11-06-06 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Asphalt paver laying asphalt on Rest Area Service Road. |
|
D11 dozer being transported on a float. |
|
Crane tower, Brunswick River. |
|
Bridge columns, north of Shara Blvd. |
 |
| Week Ending 18-06-06 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Partially complete formwork and reinforcing steel for northbound pier, Brunswick River Bridge. |
|
Service Road deck looking north. |
|
Service Road pier and deck. |
|
Service Road deck and pier, tower crane and northbound pier. |
 |
| Week Ending 30-06-06 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Retaining Wall 4G on STP Road. |
|
Bridge Overpass Falsework at Yelgun Interchange. |
|
Department of Environment & Conservation (EPA, NPWS), RTA and Abigroup site inspection. |
|
Marshalls Creek. Headstocks for new southbound bridges. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Cut 6 - the major cutting. |
|
Pumping concrete into the southern pier of the northern carriageway. |
|
Brunswick River Bridge. |
|
Nightworks, Brunswick River Bridge, taken from webcam. |
 |
| Week Ending 09-07-06 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Brunswick River Bridge coming to mid span stitch stage. |
|
Brunswick River Bridge coming to mid span stitch stage. |
|
Mobile Form Traveller reaches abutment. |
|
Construction of top slab to northbound pierhead. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Formwork - Southern side of northbound Brunswick River Bridge. |
|
Steelfixing of southern end of northbound pier. |
|
Form travellers to service road at mid span. |
|
The northern side of the service road over Brunswick River Bridge. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| East face of service road bridge. |
|
View of southern side of service road and abutment. |
|
Steelfixing of southern end of northbound pier. |
|
View from the crane tower to Byron Bay Lighthouse. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Top of pier - Billinudgel. |
|
Billinudgel pedestrian overpass shoring. |
|
Precast facia panel. |
|
Reinforced earth wall - Bonanza Drive. |
 |
| Week Ending 16-07-06 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Bridge barrier - Marshall's Creek Service Road. |
|
Billinudgel overpass - formwork. |
|
Formwork - Billinudgel. |
|
Formwork - Billinudgel. |
 |
| Week Ending 23-07-06 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Yelgun Interchange northbound on ramp prior to completing formwork. |
|
Brunswick River Bridge Service Road, southern endspan ready for final concrete pour. |
|
Brunswick River Bridge Service Road, nearing completion - midspan. |
|
Brunswick River Bridge Service Road, nearing completion - midspan. |
 |
 |
 |
 |
 |
 |
 |
|
 |
| Brunswick River Bridge southern pier for northbound carriageway, supported by falsework. |
|
Abigroup, Hyder and RTA representatives - Brunswick River Bridge Service Road - midspan. |
|
Aerial view of Brunswick River Bridge southern abutment. |
|
|
 |
| Week Ending 6-08-06 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Community Liaison Group site tour. |
|
Community Liaison Group members at access tower on Billinudgel pedestrian overpass. |
|
Formwork and falsework looking south, pedestrian bridge, Billinudgel. |
|
Looking north to Yelgun Interchange. Freshly sealed pavement in foreground. |
 |
| Week Ending 13-08-06 |
 |
 |
 |
 |
 |
 |
 |
|
 |
| Abutment prior to backfilling, Brunswick River Bridge, south end. |
|
Mobile crane relocating MFTs from Service Road to North Bound Brunswick River Bridges. MFT temporarily placed on ground. |
|
Brunswick River Bridge deck connection with retaining wall abutment. |
|
|
 |
| Week Ending 20-08-06 |
 |
 |
 |
 |
 |
 |
 |
|
 |
| Tube stock planting. |
|
Interlocked form-travellers being prepared for casting the northbound bridge over the river. |
|
Perspective view from the north of the new Service Road. |
|
|
 |
| Week Ending 27-08-06 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Construction of pedestrian overpass at Billinudgel |
|
Native tube stock delivered to site, ready for plant out. |
|
Progressive revegetation of new road batter. |
|
Bridge access on new STP road. |
 |
 |
 |
 |
 |
 |
 |
|
 |
| Heritage item found on site. |
|
Representative of DEC examining artefact found on site. |
|
Super T Bridge Girder awaiting transfer to Tweed Street. |
|
|
 |
| Week Ending 10-09-06 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Northern form travellers commencing construction of north bound bridge deck. |
|
Southern form travellers commencing construction of north bound bridge deck. |
|
Bridge 8, Span 11 concrete pour. |
|
Brunswick River Bridge site. |
 |
| Week Ending 17-09-06 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Rainforest plantings in rich red top soil, amongst healthy growing hydromulch. |
|
Hydromulch of annual grasses, pasture species and native trees and shrubs, showing growth after approximately 1 month. |
|
28m Piles, which will be used to build Bridge 10A (Marshall's Creek Overflow). |
|
Nightworks: stormwater pavement drainage installation. |
 |
 |
 |
|
 |
|
 |
|
 |
| Stormwater cross drainage under the existing highway. |
|
|
|
|
|
|
 |
| Week Ending 08-10-06 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Crane base. (Crane removal and reassembly over long weekend at Brunswick River.) |
|
Crane cab being lifted into position. (Crane removal and reassembly over long weekend at Brunswick River.) |
|
Relocated crane tower, ready for erection of boom. |
|
Northern crane tower relocated into new position. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Southern form traveller nearing abutment segment. |
|
Crane driver's eye view, looking north (Brunswick River Bridges) |
|
MTP (Material Transfer Placer) This is a mobile and adjustable conveyor belt used to place material where required and used with concrete, dirt, aggregate stone etc. |
|
Looking Northwards, in the foreground is the bridge over the future Coolamon Scenic Drive. In the background, the new Tunnel Road adjacent the highway upgrade as it approaches Billinudgel. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Yelgun Interchange Bridge No. 2. |
|
Marshall's Creek Overflow Bridge, span 1 awaiting demolishing, span 2 already demolished. |
|
Bridge Demolition Span 1 Marshall's Creek Overflow. |
|
Pulveriser used in demolition work. |
 |
 |
 |
|
 |
|
 |
|
 |
| Rainforest and dry sclerophyll tubestock planting around Banana Road. |
|
|
|
|
|
|
 |
| Week Ending 15-10-06 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Steel Fixing Billinudgel Overpass. |
|
Bridge 11 at Yelgun Interchange. |
|
Bridge 12 at Yelgun Interchange showing final curtain. |
|
Paving new service road, north of Rajah Road. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Local access Brunswick River Bridge and road prior to finishing. |
|
Looking north, showing old bridge over Brunswick River and three new bridges under construction. |
|
Demolition of Marshalls Creek bridges. |
|
Early stage of a constructed wetland. |
 |
| Week Ending 05-11-06 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Stripping formwork on Bridge 8, Billinudgel Pedestrian Overpass. |
|
Brunswick River Bridges showing construction of northbound, southbound bridges and local service road bridge. |
|
Advanced stages of Brunswick River service road bridge construction. |
|
Final casting of northbound Brunswick River Bridge. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Southwards view of Brunswick River Bridges. |
|
Re-vegetation occurring in conjunction with earthworks (dozer and scraper operating in foreground). |
|
Water truck in operation during earthworks in vicinity of STP Road. |
|
Preparation of formwork prior to reinforcement placement on Billinudgel Overpass. |
 |
 |
 |
|
 |
|
 |
|
 |
| Community Liaison Group members’ site tour 1.11.06. Inspecting service road bridge over Brunswick River. |
|
|
|
|
|
|
 |
| Week Ending 30-12-06 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Service Road, Brunswick River, prior to switch. |
|
Last vehicle heading north on old Brunswick River bridge at 1.59pm on 11.12.06. |
|
Traffic on new Brunswick River Service Road bridge. |
|
Looking south from crane as earthworks and continue on approach to Brunswick River. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Brunswick River bridges. |
|
Old bridge, new bridges, looking down from crane. |
|
Translocation site, monitoring endangered species. |
|
MPT placing concrete on northbound off ramp at Yelgun interchange. |
 |
| Week Ending 14-01-07 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Marshalls Creek south bound bridge prior to deck reinforcing. |
|
Saw cutting concrete paving. |
|
Bridge 8 Billinudgel Pedestrian Overpass. |
|
Yelgun Interchange overbridge. |
 |
| Week Ending 29-01-07 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Working on bottom formwork travellers. |
|
Brunswick River bridges looking south. |
|
Looking north from Brunswick River bridges. |
|
Local, northern and southern bridges over Brunswick River. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Three bridges, with southbound bridge nearing completion. |
|
Southern view taken from crane at Brunswick River bridge. |
|
Four bridges over the Brunswick River. |
|
Installation of culvert, southern section of project. |
 |
 |
 |
|
 |
|
 |
|
 |
| Footings for Retaining Wall 1. |
|
|
|
|
|
|
 |
| Week Ending 19-02-07 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Burny Bean vine surrounded by successful tubestock revegetation. |
|
Erecting throw screens at the Billinudgel overpass. |
|
Billinudgel pedestrian overpass, looking west. |
|
Wetland Basin under Billinudgel overpass, prior to final landscaping. |
 |
 |
 |
 |
 |
|
 |
|
 |
| Compacted fill prior to laying pavement. |
|
Forming centre span and final major structural pour on Brunswick River Bridge. |
|
|
|
|
 |
| Week Ending 11-03-07 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Installing Billinudgel overpass safety screens during nightworks. |
|
Throw screens on Billinudgel bridge overpass, as seen from bridge deck. |
|
Brunswick River Bridges. |
|
Preparation for removal of MFTs on Brunswick River Bridges. |
 |
 |
 |
|
 |
|
 |
|
 |
| Wire rope crash barrier posts installed south of Bonanza Drive. |
|
|
|
|
|
|
 |
| Week Ending 25-03-07 |
 |
 |
 |
 |
 |
 |
 |
|
 |
| Marshalls Creek Overflow showing re-planted riparian tubestock. |
|
The new Brunswick River Bridges with the old bridge in the background. |
|
Pre-cast concrete panelling for underside of Brunswick River Bridge abutment. |
|
|
 |
| Week Ending 1-04-07 |
 |
 |
 |
 |
 |
 |
 |
|
 |
| Aerial view Yelgun Interchange and the Rest Area. |
|
Aerial of Billinudgel. |
|
Aerial of new alignment around Coolamon Scenic Drive. |
|
|
 |
| Week Ending 14-04-07 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Shotcrete applied to Wall 4. Preparing for installation of facia panels. |
|
Cut 7, showing Tunnel Road and new highway. |
|
Steel wire rope posts awaiting installation of cable. |
|
Batter paving Coolamon Scenic Drive underpass. |
 |
 |
 |
|
 |
|
 |
|
 |
| Handpour: tying in the barrier concrete to the CRC paving at Billinudgel. |
|
|
|
|
|
|
 |
| Week Ending 22-04-07 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| CM1600 In-Side Travel Concrete Paver. Lays concrete 10.6m wide. |
|
Bridge 8 Billinudgel Pedestrian Overpass. |
|
View from Bridge 8, looking south. |
|
Throw screen posts (also known as ‘whale bones’) Yelgun Interchange. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Throw screen posts (also known as ‘whale bones’) Yelgun Interchange. |
|
Yelgun Interchange bridge. |
|
Parapet ‘shells’ awaiting installation at Yelgun. |
|
Planting 2m trees on the western side of southern approach to Brunswick River Bridges. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Planting palms on the western side of southern approach to Brunswick River Bridges. |
|
Warning sign in place on Brunswick River Bridges. |
|
Fill 4, looking north from Brunswick River Bridges towards Rajah Road intersection. |
|
Shoulder hand pour steel layout, northern end of project near Billinudgel Road. |
 |
| Week Ending 06-05-07 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Preparing steelwork for slip form crash barrier near Rajah Road. |
|
Cut 6 almost complete, showing landscaping and preparation for steel tying. |
|
Installation of screens at Yelgun Interchange. |
|
Some of the parrot boxes awaiting installation as part of the community's Compensatory Habitat Box Project. |
 |
 |
 |
 |
 |
|
 |
|
 |
| Retaining Wall 4 showing grooved architectural design. |
|
Landscaping progressing well as construction nears completion. |
|
|
|
|
 |
| Week Ending 13-05-07 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Batch plant site soon to be de-commissioned and permanent Rest Area constructed. |
|
Brunswick River Bridge northbound carriageway almost at completion. |
|
Grader trimming the pavement material in preparation for bitumen sealing. |
|
Feature concrete on southern abutment Brunswick River Bridge. |
 |
| Week Ending 20-05-07 |
 |
 |
 |
|
 |
|
 |
|
 |
| Connection to Yelgun (looking north). |
|
|
|
|
|
|
 |
| Week Ending 3-06-07 |
 |
 |
 |
 |
 |
 |
 |
|
 |
| Paver in operation. |
|
About to start first hammering for demolition of old Brunswick River bridge. Mulch in foreground in preparation for landscaping. |
|
Hammering bridge deck. Debris collected onto barge with silt curtains in place. |
|
|
 |
| Week Ending 17-06-07 |
 |
 |
 |
 |
 |
|
 |
|
 |
| Demolition underway on the old Brunswick River bridge. |
|
Northbound off ramp at Yelgun Interchange. |
|
|
|
|
 |
| Week Ending 24-06-07 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Water quality monitoring on the Brunswick River. |
|
Demolition of span 4 on the old Brunswick River bridge. |
|
Brunswick River bridges – rubbing back underside. |
|
Landscaping, northern bank of Brunswick River. |
 |
 |
 |
 |
 |
 |
 |
|
 |
| Underneath the new Brunswick River bridges. |
|
Southern foreshore boardwalk under construction. |
|
Old Brunswick River bridge in process of demolition. |
|
|
 |
| Week Ending 01-07-07 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| New Pacific Highway, approaching Yelgun Interchange. |
|
Approaching turnoff to Ocean Shores at the Yelgun Interchange. |
|
Yelgun Rest Area amenities under construction. |
|
Installation of picnic tables, Yelgun Rest Area. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Laying floor slab and door frames for toilet block, Yelgun Rest Area. |
|
Looking south from Yelgun Interchange. |
|
Installing electrical wiring for street lighting, near Billinudgel. |
|
“Shuttle buggy” and asphalt paver laying SMA (stone mastic asphalt). |
 |
| Week Ending 15-07-07 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Webcam view of Service Road and Pacific Highway showing north and southbound carriageways. |
|
Demolition of old Brunswick River bridge. |
|
Northbound carriageway in readiness for traffic 11 July 2007. |
|
Opening of the first section of the new Highway Upgrade. |
 |
 |
 |
|
 |
|
 |
|
 |
| Removal of old noise wall at Ferry Reserve Caravan Park. |
|
|
|
|
|
|
 |
| Week Ending 19-08-07 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Southern foreshore boardwalk under construction. |
|
Low tide at the boardwalk, under Brunswick River bridges. |
|
Old Brunswick River bridge partially demolished. |
|
Construction of Orana Road roundabout with green hydromulch in background. |
 |
 |
 |
 |
 |
|
 |
|
 |
| Construction of Orana Road roundabout. |
|
Looking down Orana Road at construction of roundabout and Coolamon Scenic Drive underpass. |
|
|
|
|
 |
| September 2007 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Rest Area at Yelgun, with the Lions Driver Reviver van in position. |
|
Yelgun Rest Area and children's play equipment. |
|
Yelgun Rest Area picnic shelters. |
|
Fish friendly culvert installation on carriageway at Orana Road roundabout. |